ITAC Assessment: OK0496
ITAC logo
ITAC Assessment: OK0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Livestock and poultry feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 40,000
ft2
Annual Production 42,000
ton
Production Hrs. Annual 5,148
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,202 1,165,885
kWh
Electricity Fees $8,380 -
Natural Gas $28,529 8,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 3.8314: Purchase high materials in returnable bulk containers $32,272 $140,000 - $32,272
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,549 $3,017 $5,549
83,236
kWh
-
03 2.4133: Use most efficient type of electric motors $2,697 $8,963 $2,697
40,152
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,930 $300 $1,930
28,722
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $502 $1,190 $502
7,620
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $145 - $145
2,052
kWh
-
TOTAL RECOMMENDED $43,095 $153,470 $10,823
161,782
kWh
$32,272
-
lb
TOTAL IMPLEMENTED $40,663 $151,980 $8,391
125,440
kWh
$32,272
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs