ITAC Assessment: OK0493
ITAC logo
ITAC Assessment: OK0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Gas cogeneration, Turbine inlets and exhausts
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 700,000
ft2
Annual Production 44,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,139 3,844,666
kWh
Electricity Demand $85,432 12,447
kW-mo/yr
Electricity Fees $13,795 -
Natural Gas $63,661 19,347
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.6218: Turn off equipment when not in use $92 $100 $92
3,224
kWh
- - -
02 2.7134: Use photocell controls $237 $90 $237
7,913
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,380 $1,416 $1,034
35,170
kWh
$346
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $1,474 $277 - - $1,474
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $143 $321 $107
3,517
kWh
$36
-
kW-mo/yr
- -
06 3.8143: Recycle cleaning solvent and reuse $6,123 $500 - - - $6,123
-
gal
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $64 $60 $64
2,052
kWh
- - -
08 2.7135: Install occupancy sensors $113 $336 $113
4,103
kWh
- - -
TOTAL RECOMMENDED $9,626 $3,100 $1,647
55,979
kWh
$382
-
kW-mo/yr
$1,474
-
MMBtu
$6,123
-
gal
TOTAL IMPLEMENTED $1,679 $1,897 $1,297
43,963
kWh
$382
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs