ITAC Assessment: OK0467
ITAC logo
ITAC Assessment: OK0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Ceramic tiles
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 300,000
ft2
Annual Production 38,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,373 14,880,715
kWh
Natural Gas $573,590 228,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,046 $2,349 $1,046
26,377
kWh
02 2.7135: Install occupancy sensors $782 $910 $782
26,377
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,563 $32,566 $12,563
321,512
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,548 - $1,548
52,462
kWh
TOTAL RECOMMENDED $15,939 $35,825 $15,939
426,728
kWh
TOTAL IMPLEMENTED $15,157 $34,915 $15,157
400,351
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs