Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cable Assemblies
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 76,500
ft2
Annual Production 73,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,618 1,314,185
kWh
Natural Gas $12,308 3,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,199

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $7,946 $25,000 - $7,946
-
MMBtu
02 2.3191: Use demand controller or load shedder $2,563 $189 $2,563
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $703 $2,803 $703
12,016
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $554 $416
3,517
kWh
-
05 2.7135: Install occupancy sensors $274 $717 $274
12,309
kWh
-
TOTAL RECOMMENDED $11,902 $29,263 $3,956
27,842
kWh
$7,946
-
MMBtu
TOTAL IMPLEMENTED $11,199 $26,460 $3,253
15,826
kWh
$7,946
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs