ITAC Assessment: OK0447
ITAC logo
ITAC Assessment: OK0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated shipping containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 139,000
ft2
Annual Production 725,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,519 4,508,793
kWh
Natural Gas $103,502 51,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,205

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,233 $8,800 $9,233
138,921
kWh
-
02 2.2511: Insulate bare equipment $505 $526 - $505
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,645 - $1,645
29,308
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $9,581 $2,618 - $9,581
-
MMBtu
05 2.2437: Recover waste heat from equipment $1,652 $832 - $1,652
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $815 $2,199 $815
4,689
kWh
-
07 2.7232: Replace existing hvac unit with high efficiency model $43,497 $198,000 $43,497
567,116
kWh
-
TOTAL RECOMMENDED $66,928 $212,975 $55,190
740,034
kWh
$11,738
-
MMBtu
TOTAL IMPLEMENTED $12,205 $12,357 $10,048
143,610
kWh
$2,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs