Assessment Year | 1994 |
---|---|
Principal Product | Feed mill |
NAICS |
n/a
|
SIC | 2047: Dog and Cat Food |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
76,800
ft2
|
Annual Production | 70,000
ton
|
Production Hrs. Annual | 1,728
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,103 | 2,811,548 |
kWh
|
$0.056 |
Natural Gas | $27,459 | 9,005 |
MMBtu
|
$3.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,346 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,475 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $281 | $49 | - |
$281
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,617 | $6,230 |
$7,617
151,524
kWh
|
- | |
03 | 2.3212: Optimize plant power factor | $585 | $1,485 |
$585
14,361
kWh
|
- | |
04 | 2.7134: Use photocell controls | $90 | $75 |
$90
2,345
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,491 | $3,107 |
$1,491
20,223
kWh
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $795 | $229 |
$996
19,050
kWh
|
$(-201.0)
-
MMBtu
|
|
07 | 2.4133: Use most efficient type of electric motors | $8,303 | $17,600 |
$8,303
202,521
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,445 | - |
$4,445
240,328
kWh
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $739 | $2,618 | - |
$739
-
MMBtu
|
|
TOTAL RECOMMENDED | $24,346 | $31,393 |
$23,527
650,352
kWh
|
$819
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,475 | $26,572 |
$20,455
596,718
kWh
|
$1,020
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs