ITAC Assessment: OK0445
ITAC logo
ITAC Assessment: OK0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Feed mill
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 76,800
ft2
Annual Production 70,000
ton
Production Hrs. Annual 1,728
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,103 2,811,548
kWh
Natural Gas $27,459 9,005
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,475

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $281 $49 - $281
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,617 $6,230 $7,617
151,524
kWh
-
03 2.3212: Optimize plant power factor $585 $1,485 $585
14,361
kWh
-
04 2.7134: Use photocell controls $90 $75 $90
2,345
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,491 $3,107 $1,491
20,223
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $795 $229 $996
19,050
kWh
$(-201.0)
-
MMBtu
07 2.4133: Use most efficient type of electric motors $8,303 $17,600 $8,303
202,521
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,445 - $4,445
240,328
kWh
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $739 $2,618 - $739
-
MMBtu
TOTAL RECOMMENDED $24,346 $31,393 $23,527
650,352
kWh
$819
-
MMBtu
TOTAL IMPLEMENTED $21,475 $26,572 $20,455
596,718
kWh
$1,020
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs