ITAC Assessment: OK0442
ITAC logo
ITAC Assessment: OK0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Tempered glass
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 2,815
thousand feet
Production Hrs. Annual 7,836
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,816 3,050,703
kWh
Natural Gas $1,911 383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,276 $72,252 $30,276
670,574
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,448 $13,180 $2,448
4,982
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,944 $60 $1,944
44,549
kWh
04 2.4133: Use most efficient type of electric motors $1,821 $4,532 $1,821
28,722
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,809 - $1,809
28,722
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $757 $714 $757
12,016
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $638 $1,443 $638
5,569
kWh
08 2.7135: Install occupancy sensors $164 $190 $164
3,517
kWh
TOTAL RECOMMENDED $39,857 $92,371 $39,857
798,651
kWh
TOTAL IMPLEMENTED $3,339 $2,217 $3,339
62,134
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs