ITAC Assessment: OK0439
ITAC logo
ITAC Assessment: OK0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fixtures and furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 80,000
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 6,816
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,311 1,664,127
kWh
Natural Gas $25,336 8,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,654

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,568 $4,848 $1,568
17,585
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,701 $12,214 $3,701
46,893
kWh
-
03 2.7135: Install occupancy sensors $187 $200 $187
4,982
kWh
-
04 2.4133: Use most efficient type of electric motors $665 $851 $665
17,585
kWh
-
05 2.2437: Recover waste heat from equipment $1,114 $800 - $1,114
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $766 - $766
24,033
kWh
-
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,266 $3,750 $1,266
33,411
kWh
-
TOTAL RECOMMENDED $9,267 $22,663 $8,153
144,489
kWh
$1,114
-
MMBtu
TOTAL IMPLEMENTED $4,654 $12,414 $4,654
75,908
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs