ITAC Assessment: OK0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Processed peanuts
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 216,246
ft2
Annual Production 90,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $438,023 6,485,639
kWh
Natural Gas $15,905 3,202
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7134: Use photocell controls $2,392 - $2,392
34,291
kWh
02 2.4133: Use most efficient type of electric motors $9,437 $16,090 $9,437
134,818
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,975 $5,400 $2,975
42,497
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,305 $68,590 $17,305
247,362
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $97 - $97
1,465
kWh
06 2.2437: Recover waste heat from equipment $717 $2,000 $717
42,790
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,608 $2,530 $1,608
19,930
kWh
TOTAL RECOMMENDED $34,531 $94,610 $34,531
523,153
kWh
TOTAL IMPLEMENTED $32,923 $92,080 $32,923
503,223
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs