Assessment Year 1993
Principal Product Hydraulic Planetary Winches
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 81,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,482 923,212
kWh
Natural Gas $20,676 5,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,284 $10,500 $3,284
61,254
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,406 $5,658 $1,406
16,706
kWh
-
03 2.2437: Recover waste heat from equipment $390 $1,000 - $390
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $289 $559 $289
4,689
kWh
-
TOTAL RECOMMENDED $5,369 $17,717 $4,979
82,649
kWh
$390
-
MMBtu
TOTAL IMPLEMENTED $1,695 $6,217 $1,695
21,395
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs