ITAC Assessment: OK0412
ITAC logo
ITAC Assessment: OK0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Fruit Perserves, Jellies, Sauces, Mu
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 166
Plant Area 122,260
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,708
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,469 3,654,748
kWh
Natural Gas $115,843 38,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,201 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $5,522 $16,100 - $5,522
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $74 $3,053 $74
6,155
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $713 - $713
21,981
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,747 $5,964 $2,747
56,272
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,145 - $2,145
60,961
kWh
-
TOTAL RECOMMENDED $11,201 $25,117 $5,679
145,369
kWh
$5,522
-
MMBtu
TOTAL IMPLEMENTED $2,219 $3,053 $2,219
67,116