ITAC Assessment: CO0069
ITAC logo
ITAC Assessment: CO0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ASPHALT PRODUCTS
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 13
Plant Area
n/a
Annual Production 50,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,705 581,184
kWh
Natural Gas $147,680 36,776
MMBtu
Fuel Oil #2 $53,925 30,198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $21,903 $109,000 - $2,412
-
MMBtu
$19,491
-
MMBtu
02 2.2424: Use heat in flue gases to preheat products or materials $7,895 $20,000 - $484
-
MMBtu
$7,411
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $8,322 $300 - $8,322
-
MMBtu
-
04 2.1222: Install turbulators $3,185 $3,000 - $3,185
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $2,429 $200 - $2,429
-
MMBtu
-
06 2.4312: Improve lubrication practices $3,409 - $3,409
49,824
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,274 $4,400 $3,274
48,066
kWh
- -
08 2.2122: Install / repair insulation on condensate lines $718 $500 - $718
-
MMBtu
-
TOTAL RECOMMENDED $51,135 $137,400 $6,683
97,890
kWh
$17,550
-
MMBtu
$26,902
-
MMBtu
TOTAL IMPLEMENTED $11,469 $1,000 - $11,469
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs