Assessment Year | 1986 |
---|---|
Principal Product | ASPHALT PRODUCTS |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 13 |
Plant Area |
n/a
|
Annual Production | 50,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,705 | 581,184 |
kWh
|
$0.068 |
Natural Gas | $147,680 | 36,776 |
MMBtu
|
$4.02 |
Fuel Oil #2 | $53,925 | 30,198 |
MMBtu
|
$1.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,469 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $21,903 | $109,000 | - |
$2,412
-
MMBtu
|
$19,491
-
MMBtu
|
|
02 | 2.2424: Use heat in flue gases to preheat products or materials | $7,895 | $20,000 | - |
$484
-
MMBtu
|
$7,411
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,322 | $300 | - |
$8,322
-
MMBtu
|
- | |
04 | 2.1222: Install turbulators | $3,185 | $3,000 | - |
$3,185
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $2,429 | $200 | - |
$2,429
-
MMBtu
|
- | |
06 | 2.4312: Improve lubrication practices | $3,409 | - |
$3,409
49,824
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,274 | $4,400 |
$3,274
48,066
kWh
|
- | - | |
08 | 2.2122: Install / repair insulation on condensate lines | $718 | $500 | - |
$718
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $51,135 | $137,400 |
$6,683
97,890
kWh
|
$17,550
-
MMBtu
|
$26,902
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,469 | $1,000 | - |
$11,469
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs