ITAC Assessment: OK0405
ITAC logo
ITAC Assessment: OK0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Telephone Switch Gear Equipment
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $1
M
to 5
M
# of Employees 360
Plant Area 201,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,307 5,025,791
kWh
Natural Gas $20,099 5,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,583 $22,620 $5,583
92,907
kWh
02 2.7111: Reduce illumination to minimum necessary levels $2,013 - $2,013
26,964
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,502 $3,116 $1,502
22,860
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,068 - $1,068
22,567
kWh
05 2.7135: Install occupancy sensors $741 $2,200 $741
24,912
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $316 - $316
12,016
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $512 $272
2,052
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $149 $513 $149
2,638
kWh
TOTAL RECOMMENDED $11,644 $28,961 $11,644
206,916
kWh
TOTAL IMPLEMENTED $2,239 $4,141 $2,239
39,566
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs