ITAC Assessment: OK0387
ITAC logo
ITAC Assessment: OK0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STAINLESS STEEL TUBING
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area
n/a
Annual Production 21,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,896 2,980,363
kWh
Natural Gas $7,129 1,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $20,408 $1,580 $20,408
375,733
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,003 $8,297 $5,003
101,407
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,457 $1,131 $3,283
62,134
kWh
- $(-826.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,087 $1,276 $1,087
20,516
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $832 - $832
20,809
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $615 $2,279 $615
12,309
kWh
- -
07 2.2437: Recover waste heat from equipment $612 $1,922 - $612
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $135 $318 $135
2,052
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $7 $111 $21
293
kWh
- $(-14.0)
TOTAL RECOMMENDED $31,156 $16,914 $31,384
595,253
kWh
$612
-
MMBtu
$(-840.0)
TOTAL IMPLEMENTED $24,791 $4,098 $25,631
479,485
kWh
- $(-840.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs