ITAC Assessment: OK0386
ITAC logo
ITAC Assessment: OK0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product JELLIES,MUSTARD, & MAYO
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,046 1,817,995
kWh
Natural Gas $87,947 31,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,431 $1,854 $5,131
52,462
kWh
- $(-1,700.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,458 $298 $2,458
56,565
kWh
- -
03 2.2136: Install / repair insulation on steam lines $2,349 $3,893 - $2,349
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,127 $367 $1,258
20,809
kWh
- $(-131.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $185 $344 $238
2,052
kWh
- $(-53.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $495 - $495
7,913
kWh
- -
07 2.2122: Install / repair insulation on condensate lines $371 $450 - $371
-
MMBtu
-
08 2.2122: Install / repair insulation on condensate lines $250 $216 - $250
-
MMBtu
-
TOTAL RECOMMENDED $10,666 $7,422 $9,580
139,801
kWh
$2,970
-
MMBtu
$(-1,884.0)
TOTAL IMPLEMENTED $7,081 $6,757 $5,864
62,427
kWh
$2,970
-
MMBtu
$(-1,753.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs