ITAC Assessment: OK0383
ITAC logo
ITAC Assessment: OK0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product REBUILT AUTO STARTERS
NAICS
n/a
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area
n/a
Annual Production 4,500,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,692 3,623,095
kWh
Natural Gas $36,603 12,241
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $118 $423 $224
3,810
kWh
$(-106.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,589 $1,399 $4,685
97,890
kWh
$(-1,096.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $978 $1,060 $812
13,482
kWh
$166
04 2.7142: Utilize higher efficiency lamps and/or ballasts $224 $236 $169
3,517
kWh
$55
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,966 - $5,166
150,645
kWh
$(-200.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,621 $6,979 $5,621
117,233
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,752 $36,300 $11,752
342,614
kWh
-
TOTAL RECOMMENDED $27,248 $46,397 $28,429
729,191
kWh
$(-1,181.0)
TOTAL IMPLEMENTED $9,875 $3,118 $11,056
269,344
kWh
$(-1,181.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs