ITAC Assessment: OK0379
ITAC logo
ITAC Assessment: OK0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LEAF SPRINGS
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area
n/a
Annual Production 50,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,621 550,410
kWh
Natural Gas $58,336 18,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $854 - $854
9,672
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,182 $200 $2,382
26,964
kWh
- $(-200.0)
03 2.2511: Insulate bare equipment $89 $108 - $89
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,070 $2,500 - $3,070
-
MMBtu
-
TOTAL RECOMMENDED $6,195 $2,808 $3,236
36,636
kWh
$3,159
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $6,195 $2,808 $3,236
36,636
kWh
$3,159
-
MMBtu
$(-200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs