Assessment Year | 1992 |
---|---|
Principal Product | LEAF SPRINGS |
NAICS |
n/a
|
SIC | 3493: Steel Springs, Except Wire |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 50,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,621 | 550,410 |
kWh
|
$0.088 |
Natural Gas | $58,336 | 18,996 |
MMBtu
|
$3.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,195 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $854 | - |
$854
9,672
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,182 | $200 |
$2,382
26,964
kWh
|
- | $(-200.0) | |
03 | 2.2511: Insulate bare equipment | $89 | $108 | - |
$89
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,070 | $2,500 | - |
$3,070
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $6,195 | $2,808 |
$3,236
36,636
kWh
|
$3,159
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $6,195 | $2,808 |
$3,236
36,636
kWh
|
$3,159
-
MMBtu
|
$(-200.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs