| Assessment Year | 1992 |
|---|---|
| Principal Product | LEAF SPRINGS |
| NAICS |
n/a
|
| SIC | 3493: Steel Springs, Except Wire |
| Sales Range | $5 M to 10M |
| # of Employees | 45 |
| Plant Area |
n/a
|
| Annual Production | 50,000
lb
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $48,621 | 550,410 |
kWh
|
$0.088 |
| Natural Gas | $58,336 | 18,996 |
MMBtu
|
$3.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,195 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $854 | - |
$854
9,672
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,182 | $200 |
$2,382
26,964
kWh
|
- | $(-200.0) | |
| 03 | 2.2511: Insulate bare equipment | $89 | $108 | - |
$89
-
MMBtu
|
- | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,070 | $2,500 | - |
$3,070
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $6,195 | $2,808 |
$3,236
36,636
kWh
|
$3,159
-
MMBtu
|
$(-200.0) | ||
| TOTAL IMPLEMENTED | $6,195 | $2,808 |
$3,236
36,636
kWh
|
$3,159
-
MMBtu
|
$(-200.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs