Assessment Year | 1992 |
---|---|
Principal Product | SALVAGED MACHINES PARTS |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
n/a
|
Annual Production | 3,600
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,183 | 816,530 |
kWh
|
$0.066 |
Natural Gas | $6,640 | 1,414 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,536 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,234 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $1,250 | $990 |
$1,250
-
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,302 | $7,440 |
$4,302
99,062
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,038 | - |
$1,078
24,912
kWh
|
$(-40.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $946 | - |
$946
18,171
kWh
|
- | |
TOTAL RECOMMENDED | $7,536 | $8,430 |
$7,576
142,145
kWh
|
$(-40.0) | ||
TOTAL IMPLEMENTED | $3,234 | $990 |
$3,274
43,083
kWh
|
$(-40.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs