Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SALVAGED MACHINES PARTS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 3,600
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,183 816,530
kWh
Natural Gas $6,640 1,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $1,250 $990 $1,250
-
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,302 $7,440 $4,302
99,062
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,038 - $1,078
24,912
kWh
$(-40.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $946 - $946
18,171
kWh
-
TOTAL RECOMMENDED $7,536 $8,430 $7,576
142,145
kWh
$(-40.0)
TOTAL IMPLEMENTED $3,234 $990 $3,274
43,083
kWh
$(-40.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs