ITAC Assessment: OK0362
ITAC logo
ITAC Assessment: OK0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COOKIES
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 366
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,303 2,194,900
kWh
Natural Gas $140,044 55,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $191 $453 $191
4,396
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $439 - $439
9,379
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $567 - $567
11,723
kWh
- -
04 2.2511: Insulate bare equipment $441 $473 - $441
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,215 - $1,345
28,722
kWh
- $(-130.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,858 - $4,411
76,202
kWh
- $(-553.0)
07 2.3212: Optimize plant power factor $7,037 $4,975 $7,037
-
kWh
- -
TOTAL RECOMMENDED $13,748 $5,901 $13,990
130,422
kWh
$441
-
MMBtu
$(-683.0)
TOTAL IMPLEMENTED $13,748 $5,901 $13,990
130,422
kWh
$441
-
MMBtu
$(-683.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs