ITAC Assessment: OK0360
ITAC logo
ITAC Assessment: OK0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product REFRIGERATION COMPRESSOR
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 34,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,324 2,077,667
kWh
Natural Gas $36,372 8,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,151

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $8,269 $135 $8,269
115,475
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,965 - $8,496
-
kWh
- $(-531.0)
03 2.2437: Recover waste heat from equipment $2,917 $1,000 - $2,917
-
MMBtu
-
TOTAL RECOMMENDED $19,151 $1,135 $16,765
115,475
kWh
$2,917
-
MMBtu
$(-531.0)
TOTAL IMPLEMENTED $19,151 $1,135 $16,765
115,475
kWh
$2,917
-
MMBtu
$(-531.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs