ITAC Assessment: OK0359
ITAC logo
ITAC Assessment: OK0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AIRCRAFT PARTS
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,351 2,878,957
kWh
Natural Gas $1,969 457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,638 - $14,164
196,366
kWh
$474
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,656 - $3,656
-
kWh
-
03 2.2437: Recover waste heat from equipment $2,430 $2,053 $2,430
48,359
kWh
-
TOTAL RECOMMENDED $20,724 $2,053 $20,250
244,725
kWh
$474
TOTAL IMPLEMENTED $20,724 $2,053 $20,250
244,725
kWh
$474
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs