ITAC Assessment: OK0357
ITAC logo
ITAC Assessment: OK0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VARIOUS CARBON STEEL
NAICS
n/a
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area
n/a
Annual Production 1,200
ton
Production Hrs. Annual 6,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,519 3,788,687
kWh
Natural Gas $17,901 5,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $969 $1,070 - $969
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,560 - $2,522
52,755
kWh
- $38
03 2.2531: Re-size charging openings or add movable cover or door $748 $500 - $748
-
MMBtu
-
TOTAL RECOMMENDED $4,277 $1,570 $2,522
52,755
kWh
$1,717
-
MMBtu
$38
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs