ITAC Assessment: OK0344
ITAC logo
ITAC Assessment: OK0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product UPHOLSTERED LIVING ROOMS
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,876 1,633,939
kWh
Natural Gas $26,429 5,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $370 $215 $370
6,448
kWh
- -
02 2.2437: Recover waste heat from equipment $2,697 $3,038 - $2,697
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $797 - $997
17,585
kWh
- $(-200.0)
04 2.4239: Eliminate or reduce compressed air usage $892 $110 $892
15,826
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,342 $9,572 $5,342
94,959
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $371 - $371
6,741
kWh
- -
TOTAL RECOMMENDED $10,469 $12,935 $7,972
141,559
kWh
$2,697
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $10,469 $12,935 $7,972
141,559
kWh
$2,697
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs