ITAC Assessment: OK0343
ITAC logo
ITAC Assessment: OK0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AIR RIFLES & PISTOLS
NAICS
n/a
SIC 3484: Small Arms
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 4,500,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $458,968 13,408,851
kWh
Natural Gas $149,563 31,885
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $26,827 - - $26,827
-
MMBtu
02 2.2612: Use cooling tower water instead of refrigeration $17,827 $31,500 $17,827
543,669
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,906 - $18,620
299,531
kWh
$(-3,714.0)
-
MMBtu
04 2.3212: Optimize plant power factor $1,994 $4,536 $1,994
-
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,024 - $1,024
31,360
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $916 - $916
49,531
kWh
-
07 2.4133: Use most efficient type of electric motors $581 $1,634 $581
9,672
kWh
-
TOTAL RECOMMENDED $64,075 $37,670 $40,962
933,763
kWh
$23,113
-
MMBtu
TOTAL IMPLEMENTED $64,075 $37,670 $40,962
933,763
kWh
$23,113
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs