ITAC Assessment: OK0336
ITAC logo
ITAC Assessment: OK0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product NEWSPAPER PUBLISHING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 800
Plant Area
n/a
Annual Production 90,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,791 10,447,245
kWh
Natural Gas $64,653 14,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,033 - $53,033
1,545,721
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,157 $7,830 $7,157
208,675
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,221 $7,915 $11,221
275,791
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,632 $10,000 $11,632
-
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,951 - $1,951
45,135
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $768 - - $768
-
MMBtu
TOTAL RECOMMENDED $85,762 $25,745 $84,994
2,075,322
kWh
$768
-
MMBtu
TOTAL IMPLEMENTED $85,762 $25,745 $84,994
2,075,322
kWh
$768
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs