| Assessment Year | 1990 |
|---|---|
| Principal Product | TABLE GLASSWARE |
| NAICS |
n/a
|
| SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 48,500
ton
|
| Production Hrs. Annual | 8,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $752,842 | 18,735,053 |
kWh
|
$0.040 |
| Natural Gas | $1,344,061 | 720,765 |
MMBtu
|
$1.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $288,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $55,842 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,141 | $49,497 |
$35,141
1,078,253
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,252 | $8,724 |
$14,252
274,326
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,228 | $245 |
$1,228
30,481
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,868 | $981 |
$2,868
97,597
kWh
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $2,067 | $1,265 | - |
$2,067
-
MMBtu
|
- | |
| 06 | 2.7261: Install timers and/or thermostats | $286 | $450 | - |
$286
-
MMBtu
|
- | |
| 07 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $232,376 | $678,000 |
$365,804
9,039,859
kWh
|
$(-113,088.0)
-
MMBtu
|
$(-20,340.0) | |
| TOTAL RECOMMENDED | $288,218 | $739,162 |
$419,293
10,520,516
kWh
|
$(-110,735.0)
-
MMBtu
|
$(-20,340.0) | ||
| TOTAL IMPLEMENTED | $55,842 | $61,162 |
$53,489
1,480,657
kWh
|
$2,353
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs