ITAC Assessment: OK0318
ITAC logo
ITAC Assessment: OK0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TABLE GLASSWARE
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 48,500
ton
Production Hrs. Annual 8,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $752,842 18,735,053
kWh
Natural Gas $1,344,061 720,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $288,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,141 $49,497 $35,141
1,078,253
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,252 $8,724 $14,252
274,326
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,228 $245 $1,228
30,481
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,868 $981 $2,868
97,597
kWh
- -
05 2.2511: Insulate bare equipment $2,067 $1,265 - $2,067
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $286 $450 - $286
-
MMBtu
-
07 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $232,376 $678,000 $365,804
9,039,859
kWh
$(-113,088.0)
-
MMBtu
$(-20,340.0)
TOTAL RECOMMENDED $288,218 $739,162 $419,293
10,520,516
kWh
$(-110,735.0)
-
MMBtu
$(-20,340.0)
TOTAL IMPLEMENTED $55,842 $61,162 $53,489
1,480,657
kWh
$2,353
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs