| Assessment Year | 1990 | 
|---|---|
| Principal Product | URANIUM HEXAFLUORIDE | 
| NAICS | n/a | 
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified | 
| Sales Range | $10 Mto 50 M | 
| # of Employees | 260 | 
| Plant Area | n/a | 
| Annual Production | 10,000 
ton
 | 
| Production Hrs. Annual | 8,736 
hrs
 | 
| Location (State) | Oklahoma | 
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,248,008 | 56,514,948 | 
kWh
 | $0.022 | 
| Natural Gas | $435,530 | 247,172 | 
MMBtu
 | $1.76 | 
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,991 | See individual recommendations below*Non-energy impacts included in savings. | ||
| IMPLEMENTED SAVINGS* | $41,006 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | 
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,286 | $7,300 | $4,286 147,128
                                 
kWh
 | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,725 | - | - | $19,725 -
                                 
MMBtu
 | |
| 03 | 2.2122: Install / repair insulation on condensate lines | $890 | $614 | - | $890 -
                                 
MMBtu
 | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,985 | $16,500 | $2,985 102,579
                                 
kWh
 | - | |
| 05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $13,867 | $1,650 | - | $13,867 -
                                 
MMBtu
 | |
| 06 | 2.2437: Recover waste heat from equipment | $2,238 | $5,800 | - | $2,238 -
                                 
MMBtu
 | |
| TOTAL RECOMMENDED | $43,991 | $31,864 | $7,271 249,707
                                 
kWh
 | $36,720 -
                                 
MMBtu
 | ||
| TOTAL IMPLEMENTED | $41,006 | $15,364 | $4,286 147,128
                                 
kWh
 | $36,720 -
                                 
MMBtu
 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs
             
             
             
            