ITAC Assessment: OK0313
ITAC logo
ITAC Assessment: OK0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product URANIUM HEXAFLUORIDE
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area
n/a
Annual Production 10,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,248,008 56,514,948
kWh
Natural Gas $435,530 247,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,286 $7,300 $4,286
147,128
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $19,725 - - $19,725
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $890 $614 - $890
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $2,985 $16,500 $2,985
102,579
kWh
-
05 2.2444: Use hot process fluids to preheat incoming process fluids $13,867 $1,650 - $13,867
-
MMBtu
06 2.2437: Recover waste heat from equipment $2,238 $5,800 - $2,238
-
MMBtu
TOTAL RECOMMENDED $43,991 $31,864 $7,271
249,707
kWh
$36,720
-
MMBtu
TOTAL IMPLEMENTED $41,006 $15,364 $4,286
147,128
kWh
$36,720
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs