ITAC Assessment: OK0308
ITAC logo
ITAC Assessment: OK0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COMPUTER HARD DRIVE REP.
NAICS
n/a
SIC 3572: Computer Storage Devices
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 60,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,200 8,193,142
kWh
Natural Gas $16,918 5,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,691 $160 $2,691
46,014
kWh
-
02 2.4133: Use most efficient type of electric motors $157 $228 $157
4,396
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $407 $132 $407
7,620
kWh
-
04 2.1222: Install turbulators $214 $260 - $214
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,258 $2,275 $1,258
28,722
kWh
-
06 2.3511: Use plant owned transformers or lease transformers $52,043 $42,000 $52,043
(-32,825)
kWh
-
07 2.2624: Use cold waste water to cool chiller feed water $8,121 $14,000 $8,121
230,070
kWh
-
TOTAL RECOMMENDED $64,891 $59,055 $64,677
283,997
kWh
$214
-
MMBtu
TOTAL IMPLEMENTED $4,727 $3,055 $4,513
86,752
kWh
$214
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs