ITAC Assessment: OK0297
ITAC logo
ITAC Assessment: OK0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PORK & BEEF
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 8,500,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,521 2,034,877
kWh
Natural Gas $36,093 12,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $2,160 $5,523 $(-147.0)
(-2,931)
kWh
$2,307
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,738 $1,478 $3,607
69,168
kWh
- $131
03 2.7142: Utilize higher efficiency lamps and/or ballasts $233 $123 $233
4,103
kWh
- -
04 2.3212: Optimize plant power factor $1,607 $2,500 $1,607
-
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,788 - $2,788
64,478
kWh
- -
06 2.2136: Install / repair insulation on steam lines $1,017 $2,289 - $1,017
-
MMBtu
-
TOTAL RECOMMENDED $11,543 $11,913 $8,088
134,818
kWh
$3,324
-
MMBtu
$131
TOTAL IMPLEMENTED $7,776 $3,890 $6,628
137,749
kWh
$1,017
-
MMBtu
$131
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs