Assessment Year | 1989 |
---|---|
Principal Product | TIRE CARE PRODUCTS |
NAICS |
n/a
|
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,601 | 2,266,706 |
kWh
|
$0.051 |
Natural Gas | $50,391 | 17,869 |
MMBtu
|
$2.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,622 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $803 | $671 |
$803
17,585
kWh
|
- | |
02 | 2.2122: Install / repair insulation on condensate lines | $155 | $208 | - |
$155
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,624 | $1,500 | - |
$1,624
-
MMBtu
|
|
04 | 2.2113: Repair or replace steam traps | $6,091 | $7,500 | - |
$6,091
-
MMBtu
|
|
05 | 2.2515: Use optimum thickness insulation | $959 | $1,320 |
$959
31,946
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $104 | $222 |
$104
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $9,736 | $11,421 |
$1,866
51,583
kWh
|
$7,870
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,622 | $9,893 |
$907
19,637
kWh
|
$7,715
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs