ITAC Assessment: OK0293
ITAC logo
ITAC Assessment: OK0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TIRE CARE PRODUCTS
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 120,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,601 2,266,706
kWh
Natural Gas $50,391 17,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $803 $671 $803
17,585
kWh
-
02 2.2122: Install / repair insulation on condensate lines $155 $208 - $155
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,624 $1,500 - $1,624
-
MMBtu
04 2.2113: Repair or replace steam traps $6,091 $7,500 - $6,091
-
MMBtu
05 2.2515: Use optimum thickness insulation $959 $1,320 $959
31,946
kWh
-
06 2.4133: Use most efficient type of electric motors $104 $222 $104
2,052
kWh
-
TOTAL RECOMMENDED $9,736 $11,421 $1,866
51,583
kWh
$7,870
-
MMBtu
TOTAL IMPLEMENTED $8,622 $9,893 $907
19,637
kWh
$7,715
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs