ITAC Assessment: OK0292
ITAC logo
ITAC Assessment: OK0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FROZEN PREPARED ENTREES
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 12,500,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,363 5,041,032
kWh
Natural Gas $89,034 32,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,836 $4,300 $1,836
50,996
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,733 $1,674 $2,733
57,151
kWh
-
03 2.2437: Recover waste heat from equipment $6,776 $12,000 - $6,776
-
MMBtu
TOTAL RECOMMENDED $11,345 $17,974 $4,569
108,147
kWh
$6,776
-
MMBtu
TOTAL IMPLEMENTED $6,776 $12,000 - $6,776
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs