ITAC Assessment: OK0291
ITAC logo
ITAC Assessment: OK0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product AIRCRAFT PARTS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 365,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,598 4,439,039
kWh
Natural Gas $93,221 24,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,092 $668 $3,092
26,671
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,376 $18,000 $7,376
64,478
kWh
-
03 2.4133: Use most efficient type of electric motors $973 $909 $973
12,603
kWh
-
04 2.4312: Improve lubrication practices $4,974 - $4,974
64,771
kWh
-
05 2.2122: Install / repair insulation on condensate lines $356 $480 - $356
-
MMBtu
06 2.1222: Install turbulators $1,310 $2,450 - $1,310
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $844 $1,500 - $844
-
MMBtu
08 2.2514: Cover open tanks $360 $955 - $360
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,262 $100 $2,262
29,601
kWh
-
TOTAL RECOMMENDED $21,547 $25,062 $18,677
198,124
kWh
$2,870
-
MMBtu
TOTAL IMPLEMENTED $12,145 $3,177 $11,301
133,646
kWh
$844
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs