| Assessment Year | 1989 |
|---|---|
| Principal Product | AIRCRAFT PARTS |
| NAICS |
n/a
|
| SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
n/a
|
| Annual Production | 365,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $340,598 | 4,439,039 |
kWh
|
$0.077 |
| Natural Gas | $93,221 | 24,113 |
MMBtu
|
$3.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,145 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,092 | $668 |
$3,092
26,671
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,376 | $18,000 |
$7,376
64,478
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $973 | $909 |
$973
12,603
kWh
|
- | |
| 04 | 2.4312: Improve lubrication practices | $4,974 | - |
$4,974
64,771
kWh
|
- | |
| 05 | 2.2122: Install / repair insulation on condensate lines | $356 | $480 | - |
$356
-
MMBtu
|
|
| 06 | 2.1222: Install turbulators | $1,310 | $2,450 | - |
$1,310
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $844 | $1,500 | - |
$844
-
MMBtu
|
|
| 08 | 2.2514: Cover open tanks | $360 | $955 | - |
$360
-
MMBtu
|
|
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,262 | $100 |
$2,262
29,601
kWh
|
- | |
| TOTAL RECOMMENDED | $21,547 | $25,062 |
$18,677
198,124
kWh
|
$2,870
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,145 | $3,177 |
$11,301
133,646
kWh
|
$844
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs