| Assessment Year | 1989 |
|---|---|
| Principal Product | BUTTER PACKAGING |
| NAICS |
n/a
|
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 95 |
| Plant Area |
n/a
|
| Annual Production | 45,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,882 | 2,356,096 |
kWh
|
$0.052 |
| Natural Gas | $6,332 | 1,743 |
MMBtu
|
$3.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,274 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,365 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $417 | $180 | - |
$417
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $543 | - |
$583
17,585
kWh
|
- | $(-40.0) | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $647 | $1,650 |
$528
12,016
kWh
|
- | $119 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,157 | $541 |
$1,157
25,205
kWh
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $845 | $1,100 |
$845
-
kWh
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $142 | $366 |
$142
2,638
kWh
|
- | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $275 | - |
$275
5,862
kWh
|
- | - | |
| 08 | 2.2511: Insulate bare equipment | $248 | $437 | - |
$248
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $4,274 | $4,274 |
$3,530
63,306
kWh
|
$665
-
MMBtu
|
$79 | ||
| TOTAL IMPLEMENTED | $2,365 | $1,344 |
$2,157
51,290
kWh
|
$248
-
MMBtu
|
$(-40.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs