ITAC Assessment: OK0273
ITAC logo
ITAC Assessment: OK0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PROCESSED MEATS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,380 1,353,458
kWh
Natural Gas $23,641 7,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $343 $199 $184
5,275
kWh
$159
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $339 $360 $339
7,620
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $263 - $263
6,155
kWh
- -
04 2.2511: Insulate bare equipment $110 $255 - $110
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $408 $126 $408
8,206
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $233 $244 $208
4,103
kWh
- $25
TOTAL RECOMMENDED $1,696 $1,184 $1,402
31,359
kWh
$269
-
MMBtu
$25
TOTAL IMPLEMENTED $263 - $263
6,155
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs