Assessment Year | 1988 |
---|---|
Principal Product | PORTLAND CEMENT |
NAICS |
n/a
|
SIC | 3241: Cement, Hydraulic |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,658,200 | 65,783,999 |
kWh
|
$0.040 |
Natural Gas | $3,978,700 | 2,838,600 |
MMBtu
|
$1.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,378,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,433 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $1,269,732 | $3,600,000 |
$1,707,012
50,400,059
kWh
|
$(-329,280.0)
-
MMBtu
|
$(-108,000.0) | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $84,626 | $177,400 |
$84,626
2,808,910
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,950 | $8,048 |
$13,941
411,489
kWh
|
- | $3,009 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,483 | $3,750 |
$3,483
102,872
kWh
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $3,720 | $1,400 |
$3,720
123,388
kWh
|
- | - | |
TOTAL RECOMMENDED | $1,378,511 | $3,790,598 |
$1,812,782
53,846,718
kWh
|
$(-329,280.0)
-
MMBtu
|
$(-104,991.0) | ||
TOTAL IMPLEMENTED | $20,433 | $11,798 |
$17,424
514,361
kWh
|
- | $3,009 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs