ITAC Assessment: OK0270
ITAC logo
ITAC Assessment: OK0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PORTLAND CEMENT
NAICS
n/a
SIC 3241: Cement, Hydraulic
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,400
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,658,200 65,783,999
kWh
Natural Gas $3,978,700 2,838,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,378,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,269,732 $3,600,000 $1,707,012
50,400,059
kWh
$(-329,280.0)
-
MMBtu
$(-108,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $84,626 $177,400 $84,626
2,808,910
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,950 $8,048 $13,941
411,489
kWh
- $3,009
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,483 $3,750 $3,483
102,872
kWh
- -
05 2.6218: Turn off equipment when not in use $3,720 $1,400 $3,720
123,388
kWh
- -
TOTAL RECOMMENDED $1,378,511 $3,790,598 $1,812,782
53,846,718
kWh
$(-329,280.0)
-
MMBtu
$(-104,991.0)
TOTAL IMPLEMENTED $20,433 $11,798 $17,424
514,361
kWh
- $3,009
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs