ITAC Assessment: OK0268
ITAC logo
ITAC Assessment: OK0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ELECTRIC MOTORS
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 25,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,955 3,368,113
kWh
Natural Gas $81,928 20,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $952 $449 $952
13,482
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $5,034 $520 $5,034
78,546
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,336 - $1,336
11,723
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $636 $346
4,982
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $11,350 $2,030 - $11,350
-
MMBtu
06 2.2511: Insulate bare equipment $2,083 $1,185 $2,083
29,308
kWh
-
07 2.2531: Re-size charging openings or add movable cover or door $320 $637 $320
4,396
kWh
-
08 2.4239: Eliminate or reduce compressed air usage $4,742 $275 $4,742
118,406
kWh
-
TOTAL RECOMMENDED $26,163 $5,732 $14,813
260,843
kWh
$11,350
-
MMBtu
TOTAL IMPLEMENTED $24,865 $4,647 $13,515
242,379
kWh
$11,350
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs