ITAC Assessment: OK0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product METAL FURNITURE
NAICS
n/a
SIC 2514: Metal Household Furniture
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 425,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,915 1,194,607
kWh
Natural Gas $107,783 33,435
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $408 $249 $408
7,327
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,185 $3,399 $1,185
16,706
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $146 $351 $146
2,638
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $1,977 $600 $1,977
35,170
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $743 - $843
14,947
kWh
- $(-100.0)
06 2.7231: Use radiant heater for spot heating $3,249 $3,150 - $3,249
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $95 $287 $95
1,758
kWh
- -
TOTAL RECOMMENDED $7,803 $8,036 $4,654
78,546
kWh
$3,249
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $5,272 $6,836 $2,123
33,411
kWh
$3,249
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs