ITAC Assessment: OK0222
ITAC logo
ITAC Assessment: OK0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUDIO VISUAL FURNITURE & EQUIPMENT
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,177 710,141
kWh
Natural Gas $36,464 10,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,153 $9,288 $5,153
50,410
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $884 $270 $884
6,741
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $388 $573 $388
3,224
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $179 $225 $179
1,465
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $153 $93 $153
879
kWh
-
06 2.4133: Use most efficient type of electric motors $138 $126 $138
1,465
kWh
-
07 2.4322: Use or replace with energy efficient substitutes $1,879 $3,360 $(-14,314.0)
(-140,387)
kWh
$16,193
-
MMBtu
TOTAL RECOMMENDED $8,774 $13,935 $(-7,419.0)
(-76,203)
kWh
$16,193
-
MMBtu
TOTAL IMPLEMENTED $1,742 $1,287 $1,742
13,774
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs