| Assessment Year | 1986 |
|---|---|
| Principal Product | PRINTED BUSINESS FORMS |
| NAICS |
n/a
|
| SIC | 2761: Manifold Business Forms |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 62,700,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $530,743 | 10,453,107 |
kWh
|
$0.051 |
| Natural Gas | $149,672 | 40,833 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,156 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $7,240 | - |
$7,840
145,662
kWh
|
- | $(-600.0) | |
| 02 | 2.3212: Optimize plant power factor | $5,176 | $10,000 |
$5,176
-
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $688 | $422 |
$688
13,482
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $269 | $132 |
$269
5,569
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $297 | $294 |
$297
7,620
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,305 | $225 |
$2,305
55,393
kWh
|
- | - | |
| 07 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $6,220 | $3,500 |
$6,220
138,628
kWh
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,395 | $1,500 | - |
$1,395
-
MMBtu
|
- | |
| 09 | 2.4322: Use or replace with energy efficient substitutes | $7,017 | $14,850 | - |
$7,017
-
MMBtu
|
- | |
| 10 | 2.2122: Install / repair insulation on condensate lines | $1,185 | $476 | - |
$1,185
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $31,792 | $31,399 |
$22,795
366,354
kWh
|
$9,597
-
MMBtu
|
$(-600.0) | ||
| TOTAL IMPLEMENTED | $13,156 | $17,899 |
$3,559
82,064
kWh
|
$9,597
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs