ITAC Assessment: OK0208
ITAC logo
ITAC Assessment: OK0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product SHAMPOO AND CONDITIONER
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area
n/a
Annual Production 700
Tgal
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,154 323,857
kWh
Natural Gas $50,724 11,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,305 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $581 $97 $503
8,499
kWh
$78
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $402 $705 $347
5,569
kWh
$55
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,115 $20 $1,115
18,757
kWh
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $207 $78 - $207
-
MMBtu
TOTAL RECOMMENDED $2,305 $900 $1,965
32,825
kWh
$340
-
MMBtu
TOTAL IMPLEMENTED $2,305 $900 $1,965
32,825
kWh
$340
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs