ITAC Assessment: OK0203
ITAC logo
ITAC Assessment: OK0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HIGH QUALITY FURNITURE
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,910 349,062
kWh
Natural Gas $16,873 3,889
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $418 $41 $418
6,741
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $227 $363 $227
3,517
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $273 $60 $333
9,086
kWh
- $(-60.0)
04 2.4133: Use most efficient type of electric motors $40 $55 $40
586
kWh
- -
05 2.7231: Use radiant heater for spot heating $4,501 $16,900 - $4,501
-
MMBtu
-
TOTAL RECOMMENDED $5,459 $17,419 $1,018
19,930
kWh
$4,501
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $958 $519 $1,018
19,930
kWh
- $(-60.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs