ITAC Assessment: OK0194
ITAC logo
ITAC Assessment: OK0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product FUEL OIL
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range less than $500
k
# of Employees 15
Plant Area
n/a
Annual Production 4,500,000
Tgal
Production Hrs. Annual 2,040
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,293 247,948
kWh
Natural Gas $60,508 16,438
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2424: Use heat in flue gases to preheat products or materials $58,564 $35,000 $(-2,091.0)
(-30,481)
kWh
$60,655
-
MMBtu
-
02 2.2444: Use hot process fluids to preheat incoming process fluids $1,873 $500 - - $1,873
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $540 $1,475 $540
7,913
kWh
- -
TOTAL RECOMMENDED $60,977 $36,975 $(-1,551.0)
(-22,568)
kWh
$60,655
-
MMBtu
$1,873
-
MMBtu
TOTAL IMPLEMENTED $60,977 $36,975 $(-1,551.0)
(-22,568)
kWh
$60,655
-
MMBtu
$1,873
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs