Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product OIL INSTRUMENTATION
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,919 1,628,077
kWh
Natural Gas $25,944 5,906
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,439 $60 $1,439
19,930
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $315 $126 $315
4,396
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $568 $292
4,103
kWh
$(-22.0)
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $310 $100 $310
8,499
kWh
- -
05 2.7231: Use radiant heater for spot heating $1,770 $4,000 - $1,770
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $539 $1,650 - $539
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $594 $513 $466
6,448
kWh
- $128
TOTAL RECOMMENDED $5,237 $7,017 $2,822
43,376
kWh
$2,287
-
MMBtu
$128
TOTAL IMPLEMENTED $2,028 $2,957 $1,383
23,446
kWh
$517
-
MMBtu
$128
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs