ITAC Assessment: OK0192
ITAC logo
ITAC Assessment: OK0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product REMANUF JET ENGINE PARTS
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 370
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,560 5,202,228
kWh
Natural Gas $59,113 15,954
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,426 $9,484 $8,552
189,039
kWh
- $(-126.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,006 $1,225 $3,006
64,478
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $10,057 $3,500 - $10,057
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,945 $7,768 $5,310
112,251
kWh
$(-365.0)
-
MMBtu
-
05 2.4322: Use or replace with energy efficient substitutes $11,547 $32,800 - $11,547
-
MMBtu
-
06 3.6124: Burn waste oil for heat $3,391 $2,400 $(-230.0)
(-4,982)
kWh
$3,621
-
MMBtu
-
07 3.4115: Recover and reuse cooling water $96,689 $52,800 $844
24,033
kWh
- $95,845
TOTAL RECOMMENDED $138,061 $109,977 $17,482
384,819
kWh
$24,860
-
MMBtu
$95,719
TOTAL IMPLEMENTED $118,293 $89,100 $844
24,033
kWh
$21,604
-
MMBtu
$95,845
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs