ITAC Assessment: OK0191
ITAC logo
ITAC Assessment: OK0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product OILFIELD EQUIPMENT
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,179 1,511,137
kWh
Natural Gas $4,293 964
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $643 - $643
15,826
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $721 $200 $721
26,377
kWh
-
03 2.2511: Insulate bare equipment $224 $92 $224
8,206
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $349 $510 $349
-
kWh
-
05 2.7231: Use radiant heater for spot heating $2,051 $7,950 - $2,051
-
MMBtu
TOTAL RECOMMENDED $3,988 $8,752 $1,937
50,409
kWh
$2,051
-
MMBtu
TOTAL IMPLEMENTED $1,588 $292 $1,588
50,409
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs