Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product OILWELL & CENTRIFUGAL PUMPS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,351 2,744,138
kWh
Natural Gas $9,570 2,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,326 $229 $1,326
23,740
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $706 $80 $706
16,413
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $5,318 - $2,420
55,979
kWh
$2,898
-
MMBtu
04 2.3212: Optimize plant power factor $4,159 $12,400 $4,159
-
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $388 $1,600 $388
-
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,381 - $9,381
-
kWh
-
TOTAL RECOMMENDED $21,278 $14,309 $18,380
96,132
kWh
$2,898
-
MMBtu
TOTAL IMPLEMENTED $7,350 $309 $4,452
96,132
kWh
$2,898
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs