ITAC Assessment: IA0186
ITAC logo
ITAC Assessment: IA0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product dry sausage products
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 270,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,140 14,918,523
kWh
Electricity Demand $110,145 28,236
kW-mo/yr
Natural Gas $310,673 129,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $152,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,615 $8,935 $1,839
70,633
kWh
$776
-
kW-mo/yr
- - - - - -
02 2.1213: Direct warmest air to combustion intake $961 $1,344 - - $961
-
MMBtu
- - - - -
03 2.7135: Install occupancy sensors $535 $266 $535
20,516
kWh
- - - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves - - - - - - - - - -
05 3.7212: Improved material handling (mixing and transfer) $25,740 $1,061 - - - - - $21,060 - $4,680
06 3.5316: Contract a wood pallet recycling company $10,267 $2,000 - - - $10,267
-
lb
- - - -
07 3.4151: Minimize water usage $842 $375 - - - - - - $842
-
Tgal
-
08 4.423: Move product using mechanical means $90,000 $11,800 - - - - $90,000 - - -
09 4.441: Install automatic packing equipment $21,840 $30,000 - - - - $21,840 - - -
TOTAL RECOMMENDED $152,800 $55,781 $2,374
91,149
kWh
$776
-
kW-mo/yr
$961
-
MMBtu
$10,267
-
lb
$111,840 $21,060 $842
-
Tgal
$4,680
TOTAL IMPLEMENTED $151,304 $54,171 $1,839
70,633
kWh
$776
-
kW-mo/yr
- $10,267
-
lb
$111,840 $21,060 $842
-
Tgal
$4,680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs