ITAC Assessment: OK0186
ITAC logo
ITAC Assessment: OK0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product DIESEL ENGINE PISTON PIN
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area
n/a
Annual Production 3,378,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,540 6,263,482
kWh
Natural Gas $206,409 56,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $678 $366 $678
9,965
kWh
- -
02 2.4133: Use most efficient type of electric motors $46 $40 $46
879
kWh
- -
03 2.2514: Cover open tanks $3,068 $829 $3,068
198,710
kWh
- -
04 2.2122: Install / repair insulation on condensate lines $832 $240 - $832
-
MMBtu
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $328 $83 - $328
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $15,479 $1,500 - $15,599
-
MMBtu
$(-120.0)
07 2.2414: Use waste heat from hot flue gases to preheat $25,391 $21,000 - $25,391
-
MMBtu
-
TOTAL RECOMMENDED $45,822 $24,058 $3,792
209,554
kWh
$42,150
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $4,952 $1,558 $3,792
209,554
kWh
$1,160
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs