Assessment Year | 1986 |
---|---|
Principal Product | DIESEL ENGINE PISTON PIN |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 148 |
Plant Area |
n/a
|
Annual Production | 3,378,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $242,540 | 6,263,482 |
kWh
|
$0.039 |
Natural Gas | $206,409 | 56,973 |
MMBtu
|
$3.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,952 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $678 | $366 |
$678
9,965
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $46 | $40 |
$46
879
kWh
|
- | - | |
03 | 2.2514: Cover open tanks | $3,068 | $829 |
$3,068
198,710
kWh
|
- | - | |
04 | 2.2122: Install / repair insulation on condensate lines | $832 | $240 | - |
$832
-
MMBtu
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $328 | $83 | - |
$328
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,479 | $1,500 | - |
$15,599
-
MMBtu
|
$(-120.0) | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $25,391 | $21,000 | - |
$25,391
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $45,822 | $24,058 |
$3,792
209,554
kWh
|
$42,150
-
MMBtu
|
$(-120.0) | ||
TOTAL IMPLEMENTED | $4,952 | $1,558 |
$3,792
209,554
kWh
|
$1,160
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs