Assessment Year | 1985 |
---|---|
Principal Product | DAIRY--ICE CREAM,YOGURT |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 7,000
Tgal
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $177,162 | 3,798,945 |
kWh
|
$0.047 |
Natural Gas | $59,617 | 13,544 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,077 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,786 | $4,300 | - |
$1,786
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $2,120 | $6,500 | - |
$2,120
-
MMBtu
|
|
03 | 2.2441: Preheat boiler makeup water with waste process heat | $3,832 | $2,940 | - |
$3,832
-
MMBtu
|
|
04 | 2.2122: Install / repair insulation on condensate lines | $1,131 | $579 | - |
$1,131
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $649 | $592 |
$649
16,413
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,428 | $57 |
$1,428
36,635
kWh
|
- | |
TOTAL RECOMMENDED | $10,946 | $14,968 |
$2,077
53,048
kWh
|
$8,869
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,077 | $649 |
$2,077
53,048
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs