ITAC Assessment: OK0181
ITAC logo
ITAC Assessment: OK0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product DAIRY--ICE CREAM,YOGURT
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 7,000
Tgal
Production Hrs. Annual 8,640
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,162 3,798,945
kWh
Natural Gas $59,617 13,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,077

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,786 $4,300 - $1,786
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $2,120 $6,500 - $2,120
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $3,832 $2,940 - $3,832
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $1,131 $579 - $1,131
-
MMBtu
05 2.4133: Use most efficient type of electric motors $649 $592 $649
16,413
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,428 $57 $1,428
36,635
kWh
-
TOTAL RECOMMENDED $10,946 $14,968 $2,077
53,048
kWh
$8,869
-
MMBtu
TOTAL IMPLEMENTED $2,077 $649 $2,077
53,048
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs