ITAC Assessment: OK0176
ITAC logo
ITAC Assessment: OK0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MOBILE HOME SKIRTING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 14
Plant Area
n/a
Annual Production 350
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,634 142,145
kWh
Natural Gas $830 188
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $428 $650 - $428
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $45 $12 $45
879
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $191 $240 $191
3,517
kWh
-
04 2.7229: Air condition only space necessary $71 $145 - $71
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18 $60 $18
293
kWh
-
TOTAL RECOMMENDED $753 $1,107 $254
4,689
kWh
$499
-
MMBtu
TOTAL IMPLEMENTED $753 $1,107 $254
4,689
kWh
$499
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs